Leadsun Global

Angliss Reserve Car Park

Client

Maribyrnong City Council

Lighting Compliance

P11C

Project Overview

To achieve net zero carbon emissions each year, the Maribyrnong City council opted to go ‘off-the-grid’ and install solar led parking lot lights system for the Angliss Reserve Car Park. But there is a challenge that they needed to complete it within two days and have no disruption.

Leadsun Solution

  • 12 sets of AE3C series 80W stand-alone solar lights
  • The maximum output power of LED is 10W (dusk to dawn operation)
  • Adaptive lighting control automatically dims lights to 30% during inactivity
  • Lithium-ion batteries provide over 10 years maintenance-free life span
  • Lowerable poles allow competitive servicing safely from ground level
  • Future-proofed with built-in wireless control & monitoring system

Leadsun’s solution was to use the easy to install integrated solar engine with plug & play LED fixture coupled with the EZYpole lowerable poles and concrete-less footings. It allowed the project team to successfully install the entire solar LED parking lot lights solution from ‘start-to-finish’ in just one day. This was achieved because this project required:

  • NO expensive underground trenching or wiring
  • NO excavation of footing holes
  • NO need for any machinery to life poles or work at heights

Leadsun’s ultra-efficient parking lot lights system offers continuous dusk to dawn operation. Besides, it achieves compliance to lighting norms during peak activity times of the evening.

We are not disturbing or contaminating, so it is a really good option for us. We have the EZYpole which is the winch pole without having to bring a Cherry Picker. Just by lowering the pole from the ground saved us a lot of money. It was a no-brainer to put these lights in here and the fact that was done in one day made it even better.

Tell us how we can light up your next project

Similar Projects