Kingston upon Hull, usually abbreviated to Hull, is a city and unitary authority in the East Riding of Yorkshire, England. It lies upon the River Hull at its confluence with the Humber Estuary, 25 miles inland from the North Sea.
The Challenge
The car park is a temporary parking lot, the user needs the lighting to become removable so that it is unnecessary to dig a hold on the ground and bury the light pole to fasten the lighting, also, it is convenient for them to change the solar light location.
Our Solution
Leadsun adopts removable installation to fasten the solar lighting, the AE2 units were fitted into the concrete bases. There is a gap at the bottom of the base like a stackable pallet, hence, the whole smart car park light with a light pole can be removed by the forklift.
Around 35 AE2 split design, smart car park light systems were technically installed in the car park, providing sufficient illumination and the removable, easy installation, high-efficient, and reliable features.